参考文献/References:
[1] CUI Peng, CHEN Xiaoqing, ZHU Yingyan, et al. The wenchuan earthquake(May 12, 2008), Sichuan province, China, and resulting geohazards[J]. Natural Hazards, 2011, 56(1): 19-36.
[2] 田述军,张 静,张珊珊,等.震后泥石流防治工程减灾效益评价研究[J].灾害学,2020,35(3):102-109.[TIAN Shujun,ZHANG Jing,ZHANG Shanshan,et al.Effectiveness evaluation of disaster reduction for debris flows control engineering after Wenchuan earthquake[J].Journal of Catastrophology,2020,35(3):102-109]
[3] 康志成.中国泥石流研究[M].北京:科学出版社,2004:195-211.[KANG Zhicheng.Research on debris flow in China[M].Beijing: Science Press,2004:195-211]
[4] 周必凡.泥石流防治指南[M].北京:科学出版社,1991:1-2.[ZHOU Bifan. Debris flow prevention and control guidelines.Beijing: Science Press,1991: 1-2]
[5] 李德基.泥石流减灾理论与实践[M].北京:科学出版社,1997:150-167. [LI Deji.Theory and practice of debris flow disaster mitigation.Beijing: Science Press,1997:150-167]
[6] 曾庆利,岳中琦,杨志法,等.谷坊在泥石流防治中的作用——以云南蒋家沟2条支沟的对比为例[J].岩石力学与工程学报,2005,24(17):3137-3145.[ZENG Qingli,YUE Zhongqi,YANG Zhifa,et al. Functions of check dam against debris flow: comparison of two watersheds of Jiangjia Gully,Yunnan,China[J].Chinese Journal of Rock Mechanics and Engineering,2005, 24(17): 3137-3145]
[7] 刘建兵,杨曼,肖智锋,等.泥石流重力拦挡坝稳定性验算方法探讨[J].东华理工大学学报:自然科学版,2013, 36(s2):43-46.[LIU Jianbing,YANG man,XIAO zhifeng,et al. Calculation of the stability of the gravity dam in front of debris flows [J]. Journal of East China Institute of Technology(Natural Science),2013,36(s2): 43-46]
[8] 丁霞,王琦,孙楠,等.浆砌石拦挡坝稳定性验算及在泥石流灾害治理中的应用[J].探矿工程-岩土钻掘工程,2015,42(10):69-75. [DING Xia,WANG Qi,SUN Nan,et al.Stability checking of stone masonry landslide dam and the application in debris flow disaster treatment[J]. Exploration Engineering(Rock & Soil Drilling and Tunneling),2015,42(10):69-75]
[9] 王秀丽,李安民.基于ANSYS泥石流拦挡坝设计软件的开发及应用[J].甘肃科学学报,2016,28(5):56-60.[ WANG Xiuli,LI Anming.Development and application of ANSYS based debris flow blocking dam design software[J]. Journal of Gansu Sciences,2016,28(5):56-60]
[10] 王小军,陈晓清,谢湘平,等.泥石流拦砂坝排泄孔优化及其数值模拟研究[J].科学技术与工程,2016,16(9):28-34.[WANG Xiaojun,CHEN Xiaoqing,XIE Xiangping,et al.The optimization of debris flow check dam drainage hole and its numerical simulation Research[J].Science Technology and Engineering,2016,16(9):28-34]
[11] 马宗源,张骏,廖红建,等.黏性泥石流拦挡工程数值模拟[J].岩土力学,2007,28(增刊):389-392.[MA Zongyuan,ZHANG Jun,LIAO Hongjian,et al.Numerical simulation of viscous debris flow block engineering[J].Rock and Soil Mechanics,2007,28(Supp):389-392]
[12] 吴宏,董金义,李瑞冬,等.三维可视化技术在舟曲县城区灾后重建泥石流防治工程中的应用[J].冰川冻土,2013,35(2):383-388.[WU Hong,DONG Jinyi,LI Ruidong,et al.Application of 3D visualization technology to debris flow control engineering of post-disaster reconstruction in Zhouqu County[J].Journal of Glaciology and Geocryology,2013,35(2):383-388]
[13] 张莉,游勇,柳金峰,等.泥石流拦砂坝坝前沉积与坝基扬压力实验研究[J].山地学报,2018,36(2):271-279.[ZHANG Li,YOU Yong,LIU Jinfeng,et al.Experimental study on characteristics of debris flow deposition and the uplift pressure of a check dam[J].Mountain Research,2018,36(2):271-279]
[14] 柳春,余志祥,骆丽茹,等.含大块石泥石流冲击作用下混凝土拦挡坝的动力学行为研究[J].振动与冲击,2019,38(14):161-168, 238.[ LIU Chun,YU Zhixiang,LUO Liru,et al.Dynamic behavior of a concrete dam impacted by debris flows with rock[J].Journal of Vibration and Shock,2019,38(14):161-168+238]
[15] 曾思伟,张世武,赵洪涛,等.国道212公路(兰州—重庆)陇南段修筑技术研究[R].甘肃省科学院地质自然灾害防治研究所,2006:50-54.[ZENG Siwei,ZHANG Shiwu,ZHAO Hongtao,et al.Key technology study on NO.212 national highway at Long Nan distract[R].Geological Hazards Prevention Institute, Gansu Academy of Sciences,2006:50-54]
[16] 李文侠.加强型泥石流柔性防护体系抗冲击性能研究[D].兰州:兰州理工大学,2016:33-44.[LI Wenxia.Research on impact performance of reinforced flexible protection net of debris flow[D].Lanzhou: Lanzhou University of Technology,2016:33-44]
[17] 张亚飞,徐光黎,谢书萌,等.格宾石笼拦挡坝在玉树地震灾区泥石流治理工程中的应用[J].安全与环境工程,2013,20(5):11-14.[ZHANG Yafei, XU Guangli, XIE Shumeng,et al.Application of gabion dam to the regulation project of debris flow in Yushu seismic disaster area[J].Safety and Environmental Engineering,2013,20(5):11-14]