参考文献/References:
[1] 中国地震局.云南鲁甸6.5级地震[EB/OL]. [2014-08-06]. http://www.cea.gov.cn/publish/dizhenj/468/553/100821/100831/201408061947 11614124070/ index.html.[China Earthquake Administration. Ludian 6.5 Earthquake in Yunnan[EB/OL]. [2014-08-06]. http://www.cea.gov.cn/publish/dizhenj/468/553/100821/100831/20140806194711614124070/ index.html.]
[2] 云南省水利厅. 鲁甸“8.03”地震牛栏江堰塞湖排险处置情况[EB/OL]. [2014-08-6]. http://www.wcb.yn.gov.cn/arti?id=28107.[Water Resources Department of Yunnan Province. Risk management of Hongshiyan dam lake in Ludian[EB/OL]. [2014-08-6]. http://www.wcb.yn.gov.cn/arti?id=28107.]
[3] 刘国贵,刘国华,陈斌. 红石岩水电站工程动床模型试验研究[J]. 水力发电,2005,31(6):27-28[Liu Guogui, Liu Guohua, Chen Bin. Test study on the moveable-bed model for Hongshiyan Hydropower Station [J]. Water Power, 2005, 31(6):27-28]
[4] 吴飞进,朱友聪,林洁. 洪石岩电站拦河坝复合式坝基方案的设计[J]. 中国农村水利水电,2006,(10):132-134[Wu Feijin, Zhu Youcong, Lin Jie. Design of Composite Dam Foundation Scenarios for the Hongshiyan Power Station Barrage [J]. China Rural Water and Hydropower, 2006,(10): 132-134]
[5] 吴党中,王茂荣. 洪石岩水电站厂房后边坡稳定性分析[J]. 水利水电技术,2006,37(10):17-20[Wu Dangzhong, Wang Maorong. Analysis on stability of back side slope of powerhouse for Hongshiyan Hydropower Station [J]. Water Resource and Hydropower Engineering, 2006, 37(10): 17-20]
[6] 唐立梅. 鲁甸县地质灾害特征、成因及防治区划研究[D]. 昆明:昆明理工大学,2007:15-22[Tang Limei. Geology hazard investigation and preventing and curing Project of Ludian [D]. Kunming: Kunming University of Science and Technology, 2007:15-22]
[7] Costa J E, Schuster R L. The formation and failure of natural dams[J]. Geological Society of America Bulletin, 1988, 100(7): 1054-1068
[8] Schuster R L, Costa J E. A perspective on landslide dams [J]. Geotechnical Special Publication, 1986,(3):1-20
[9] 柴贺军,刘浩吾,刘汉超,等. 天然土石坝稳定性初步研究[J]. 地质科技情报, 2001, 20(1):77-81[Chai Hejun, Liu Haowu, Liu Hanchao, et al. Preliminarily stability analysis of natural rock-field dam resulting from damming landslide [J]. Geological science and technology information, 2001, 20(1): 77-81]
[10] 刘宁,程尊兰,崔鹏,等. 堰塞湖及其风险控制[M]. 北京:科学出版社,2013:74-109[Liu Ning, Cheng Zunlan, Cui Peng, et al. Dammed lake and risk management [M]. Beijing: Science Press, 2013: 74-109]
[11] Casagli N,Ermini L,Rosati G. Determining grain size distribution of the material composing landslide dams in the Northern Apennines: Sampling and processing methods [J]. Engineering Geology,2003,(69):83-97
[12] 李正原. 天花板水电站水资源分析与研究[J]. 水力发电,2011,37(6):29-32[Li Zhengyuan. Analysis on Water Resources Utilization of Tianhuaban Hydropower Station [J]. Water Power, 2005, 37(6):29-32]
[13] 严容. 岷江上游崩滑堵江次生灾害及环境效应研究[D]. 成都:四川大学,2006:99-110[Yan Rong. Secondary disaster and environmental effect of landslide and collapsed dams in the upper reaehes of Minjiang River[D]. Chengdu: Sichuan University, 2006: 99-110]
[14] Froehlich D C. Embankment dam breach parameters revisited [C]//Proceeding of the 1995 ASEC conference on Water Resource Engineering. San Antonio,Texas,1995: 887-891
[15] Froehlich D C. Peak outflow from breached embankment dam[J].Journal of Water Resource Planning and Management,1996,121(1): 90-97
[16] 白世录. 土坝溃坝流量计算方法的研究[J]. 水利水电工程,1990,(2):40-47[Bai Shilu. Study on calculation method of earth dambreak flow [J]. Water and Hydropower Engineering, 1990,(2): 40-47]
[17] 昭通市水利局. 鲁甸“8.03”地震牛栏江堰塞湖排险处置情况[EB/OL]. [2014-08-10]. http://www.ztsl.gov.cn/news/ShowArticle.asp?ArticleI D=2217[Water Conservancy Bureau of Zhaotong. Risk management of Hongshiyan dam lake in Ludian[EB/OL]. [2014-08-10]. http://www.ztsl.gov.cn/news/ShowArticle.asp?ArticleID=2217]
[18] 云南省水文水资源局昭通分局. 牛栏江红石岩堰塞湖水文气象监测预警方案完成[EB/OL]. [2014-08-07]. http://www.ztswj.com/xwdt/20140807/222226.htm.[Hydrology and water resources Bureau of Zhaotong. Hydrologic meteorological monitoring and early warning project[EB/OL]. [2014-08-07]. http://www.ztswj.com/xwdt/20140807/222226.htm.]
[19] 中国水利水电第十四工程局有限公司. 感谢信背后的故事——集团昭通鲁甸抗震救灾工作纪实[EB/OL].[2014-09-23]. http://www.fcbmis.com/news/jnyw/2014/923/149231123590D H39178HB2AAF600A98.html.[SinoHydro Bureau 14. Relief work of Ludian earthquake [EB/OL].[2014-09-23]. http://www.fcbmis.com/news/jnyw/2014/923/149231123590DH39178HB2AAF600A98.html.]
[20] 中国水利水电第十四工程局有限公司. 公司鲁甸抗震救灾应急抢险突击队新建应急隧洞全部泄完红石岩堰塞湖水[EB/OL].[2014-10-10].http://www.fcbmis.com/news/jnyw/2014/1010/141010924246C4HH9JD8J1IKDIFD 14G.html.[SinoHydro Bureau 14. Tunnel work has been done to release lake water in Hongshiyan[EB/OL]. [2014-10-10]. http://www.fcbmis.com/news/jnyw/2014/1010/141010924246C4HH9JD8J1 IKDIFD14G.html.]
[21] 黄锦林. 库岸滑坡涌浪对坝体影响研究[D]. 天津:天津大学,2011:1-19[Huang Jinlin. Study on the Surge of Reservoir Bank Landslide and its Effect on Dam Body [D]. Tianjin: Tianjin University, 2011:1-19]
[22] 胡卸文,吕小平,黄润秋,等. 唐家山堰塞湖大水沟泥石流发育特征及堵江危害性评价[J]. 岩石力学与工程学报,2009,28(4):850-858[Hu Xiewen, Lu Xiaoping, Huang Runqiu, et al. Developmental features and evaluation of blocking dangers of Dashui ditch debris flow in Tangjiashan dammed lake [J]. Chinese Journal of Rock Mechanics and Engineering, 2009, 28(4): 850-858]
[23] 杨东旭,陈晓清,游勇,等. 汶川地震区绵竹小岗剑沟泥石流发展趋势[J]. 山地学报,2012,30(6):701-708[Yang Dongxu, Chen Xiaoqing, You Yong, et al. The Debris Flow Development Trend of in Xiaogangjian Gully in Mianzhu County,Wenchuan Earthquake Zone [J]. Journal of Mountain Science, 2012, 30(6): 701-708 ]
[24] 刘宁. 科学制定西藏易贡滑坡堵江减灾预案[J]. 中国水利,2000,(7):37-38[Liu Ning. Scientific development of Tibet Yigong Landslide river blocking and mitigation plans [J]. Chinese water conservancy, 2000,(7):37-38]
[25] 王晓爱,陈小勇,杨君兴. 中国金沙江一级支流牛栏江的鱼类区系分析[J]. 动物学研究,2009,30(5):585-592[Wang Xiaoai, Chen Xiaoyong, Yang Junxing. Ichthyologic Fauna of Niulan River [J]. Zoological Research,2009, 30(5): 585-592]
[26] 王伟营,王志明,卢飞. 牛栏江—滇池补水工程对鱼类的影响及补偿措施分析[G]//中国环境科学学会,中国环境科学学会学术年会论文集,北京,2013:5727-5731[Wang Weiying, Wang Zhiming, Lufei. Analysis of the impact of water replenishment project on fish and compensation measures to Niulan River [G]//Environment Science Association of China, Proceedings of annual conference of China Environmental Sciences, Beijing, 2013: 5727-5731]